![]() ![]() If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.mobile, stationary, overhead), aerial cages, any other mechanical lifting devices with associated rigging, and other equipment used for lifting, such as backhoes, excavating equipment, truck-mounted hoists, other hoists, and chain falls. Sketch of the lifting zone (showing position of lifting equipment, crew and load) and This policy applies to all persons who operate cranes (e.g.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies). ![]() ![]() Your lifting plan should include, but not limited to, the following elements: For instance, in single spreader mode the crane operator can move 50 containers in 50 moves, whereas in tandem mode, the crane can move 100 boxes in 50 moves. load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |